Newsletter

Maintenance works carried out. Please check back for updates as they are carried out.

 

 

 

 

New Tables and stools purchased for main bar area.

Major upgrade of big screen viewing with 5000 lumen laser projector.

New ceiling fans fitted in main bar.

New taps fitted in all toilets including the hall with auto shut off to prevent water wastage and also incorporating anti scald valves.

Taps in both kitchen areas new cartridge inserts fitted.

New tap fitted in side shed to allow watering of plants in patio area.

Two new glass washers and new industrial dishwasher installed in bar area and kitchen.

New carpet fitted in Lounge

New hand dryers fitted in hall changing room

Major clean and tidy of car park area. Front of club jetwashed

New Chip fryers purchased and installed in kitchen

Roof repaired where lead was stolen from room on the rear corner of the building.

Rear stage are painted for bands playing at the venue.

Door duty area painted.

Gas safety inspection and certification carried out.

Electrical safety certification carried out to club areas.

Roof repaired above ladies toilet stopping water leaking in. ceiling in ladies toilet made good and painted.

All gents toilets fitted with person sensor flushing devices for saving water.

Kitchen has had major deep clean of all equipment and extraction fan systems to insurance approved standard. Bearings in fan motor replaced.

Emergency ligh bulkheads that were faulty replaced.

Smoking area rebuilt with low maintenace posts as well as new flower planters built and fitted out with flowers. Area steam cleaned and new benches purchased.